Termocandelaria Power Plant

Cartagena de Indias, Colombia
Client

Termocandelaria

Year contract

2019

Value

USD 205 M

Ensuring the supply of demand in peak events and reducing the carbon footprint vs other alternatives

  • Additional Net Power Output: 220 MWe
  • Steam tail power plant
  • Steam Turbine supplier: Mitsubishi Hitachi Power Systems (MHPS)
  • Cooling system: Air Cooled Condenser

TR scope includes the complete EPC of this add-on project of two heat recovery steam generators with duct firing, one steam turbine and all facilities, systems and ancillary equipment relating thereto interconnected and integrated with an existing and operating open cycle plant. The existing plant is based on two W501FC Westinghouse gas turbines that will be upgraded by the customer in parallel to MHPS F4 technology. 